Range
Façade & Accessories
Alteria Aluminium Systems
James Hardie
Top Hat & Accessories
Building Membranes
Fit Out
NCS Tiles & Ceiling Systems
Metal & Drywall Systems
Finishing Systems
Plaster
Drywall Accessories
Site Protection
Linings
Fixings
Screws
Nails
Sealant & Adhesive
Packers
Safety & Workwear
Services
Resources
Delivery options
On site sale support
Trumark FAQ’s
Fibre Cement Cutting
Aluminium Batten Estimator
Ceiling Tile Estimator
Ceiling System Estimator
Technical Support
Engineering Support
Brochures
About
News
Contact
Search
×
Call 1300 00 50 52
Range
Façade & Accessories
Alteria Aluminium Systems
James Hardie
Top Hat & Accessories
Building Membranes
Fit Out
NCS Tiles & Ceiling Systems
Metal & Drywall Systems
Finishing Systems
Plaster
Drywall Accessories
Site Protection
Linings
Fixings
Screws
Nails
Sealant & Adhesive
Packers
Safety & Workwear
Services
Resources
Delivery options
On site sale support
Trumark FAQ’s
Fibre Cement Cutting
Aluminium Batten Estimator
Ceiling Tile Estimator
Ceiling System Estimator
Technical Support
Engineering Support
Brochures
About
News
Contact
Range
Façade & Accessories
Alteria Aluminium Systems
James Hardie
Top Hat & Accessories
Building Membranes
Fit Out
NCS Tiles & Ceiling Systems
Metal & Drywall Systems
Finishing Systems
Plaster
Drywall Accessories
Site Protection
Linings
Fixings
Screws
Nails
Sealant & Adhesive
Packers
Safety & Workwear
Services
Resources
Delivery options
On site sale support
Trumark FAQ’s
Fibre Cement Cutting
Aluminium Batten Estimator
Ceiling Tile Estimator
Ceiling System Estimator
Technical Support
Engineering Support
Brochures
About
News
Contact
Alteria Batten Calculation
Batten Direction
(Required)
Vertical
Horizontal
This field is hidden when viewing the form
Vertical Battens Input
Batten Profile
(Required)
30mm
50mm
Batten Spacing (mm)
(Required)
Common Spacing
30mm battens: 30mm, 60mm, 100mm
50mm battens: 25mm, 50mm, 75mm, 100mm, 150mm
Wall Length (mm)
(Required)
Wall Height (mm)
(Required)
This field is hidden when viewing the form
Batten Length
This field is hidden when viewing the form
Batten and spacing divide length – vertical
This field is hidden when viewing the form
Batten rounding calculation – vertical
This field is hidden when viewing the form
Horizontal Battens calculations
This field is hidden when viewing the form
Batten and spacing divide length – horizontal
This field is hidden when viewing the form
Batten rounding calculation – horizontal
Name
Phone
Email
Project type
Please select
Residential
Commercial
Project location
Street Address
Suburb
Australian Capital Territory
New South Wales
Northern Territory
Queensland
South Australia
Tasmania
Victoria
Western Australia
State
Post Code
Project plans
Max. file size: 40 MB.
Vertical Battens Required for your Project
Horizontal Battens Required for your Project
Notes and Assumptions of Calculator
This schedule of materials is prepared for pricing purposes. While some items may be able to be ordered directly off this schedule, it is the Contractors responsibility to check that the items ordered are correct for what is to be constructed. Trumark Group is not responsible for any costs incurred FOR wrong products ordered from this schedule. Speciality Non Stock items especially need to be signed off by the Supplier before ordering.
Where quantities have been estimated, standard industry measures and wastage allowances have been employed. It is the responsibility of the client to check and confirm all quantities.
All material take off’s are based on the plans and specifications as provided by the client.
Only items as listed and quantified above are included in this estimate.
Where there are contradictions on plans and specifications, the following order will be used to decide which solution is to be applied in this job.
Project Specification for determining product selection,
Detailed plans take precedence over floor & RC plans. Trumark takes no responsibility for any difference in value of products measured using this selection order.
Where quantities have been assessed it has been done to the best of our ability from the information supplied, for pricing purposes only. It remains The CONTRACTORS responsibility to check the schedule of quantities prior to using for pricing, or the placing of a firm order.
This estimate only covers those materials quoted, if materials which are of a similar nature, or otherwise are ordered, then the quoted price will not be applicable.
Take off has been completed as per the documentation provided only.
Scope of works and cladding area shown on attached markup drawings are determined based on provided information. Please confirm all marked up areas and notes below before placing the order.